FTTP > Installation

Fibre To The Premises is being fed to the workshop. The stages are.

1. Installation by Openreach of an access box adjacent the workshop, and conduit from the track to the workshop.✓

2. Feeding of fibre to box and connection to telephone exchange at Gunnislake✓

3.1 Routing of fibre from track box to ONT
See https://calstock.org.uk/cbin/fttp-fibre-to-the-premmises
3.2 Nov 16th Fitted Fritzbox router

Fritzbox router attached to wall and 230v supply
Fritzbox router installed and connected to 230v mains supply.

4. Installing ONT

CSP, ONT and router installed
CSP, ONT and router installed.

Created by roger • Last edit by roger on 09/08/21 10:04 pm

No feedback yet

Leave a comment

In order to leave a comment Log in now! or Register now!

Comment feed for this post

Content Hierarchy

  • Batteries:~ Rechargable
  • Battery Charging
  • Battery Manufacturers
  • Battery Temperature
  • Cables and Wires
  • Charge Controllers
  • Fusing and Isolating
  • General Topics
  • Generators
  • Installation: Caravan
  • Installation: Workshop
  • Inverters
  • Manufacturers
  • Miscellaneous
    • The Soldered Box
    • fttp
      • FTTP > Installation
      • Fritz Box
      • ONT
  • Photovoltaic Panels
  • Suppliers
  • Tools
  • Victron
May 2022
Mon Tue Wed Thu Fri Sat Sun
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31          
 << <   > >>
Run your own website!

This collection ©2022 by roger • Contact • Help • Website builder

Cookies are required to enable core site functionality.